Properties
Year of implementation: 2013
Area: 700 m²
Construction time: 3 days
Customer: Wampen
Project description
Alongside the walker and the stable surfaces, we were commissioned with installing an ECOGROUND complete riding surface in the indoor riding arena. In only 3 days there was a highly functional riding area including sub-structure, separating layer and footings. Due to the variety of disciplines that are applied to this riding area, the owner decided for our elastic and extremely economical grid, the ECORASTER TE30 and our footings brand proground Allround.
The result is a flexible, allround indoor surface that fulfills all the demands on riding comfort, durability and ease of care.
Products used for this reference